Jones Grid Systems · ADMS Simulator

Midtown West Network

13.8 kV primary · 208Y/120 V secondary grid · Distribution operations console

Network view · geographic

138 kV 13.8 kV primary feeder 208/120 V secondary main De-energized Breaker / NP closed Open Vault ≥ 100 % Vault ≥ 130 %

Shift scenarios

Hudson Area Substation

one-line

Device control

SCADA · select-before-operate

Power flow study

Primary feeders

UBLF phase amps · DPF balanced amps

Network protector board

click a protector to control it

Alarms

    Event log

    newest first

      Fictional network built for demonstration and training. Names, routes, device IDs and loads are invented and do not represent any utility's actual system. Power flow: per-unit nodal current-injection solution; UBLF uses 3×3 phase impedance matrices and per-phase loads, DPF uses the balanced positive-sequence equivalent.